Hospital equipments
delivery bed. Features foot-pedal operated height adjustment (550- 900mm), Trendelenburg/reverse Trendelenburg positioning, gas-spring assisted adjustable backrest (0-70°), slide-in/removable leg section, padded lithotomy crutches, and fluid basin. • Heavy-duty steel framework with antimicrobial powder coating; seamless high-density foam mattress with fluid-proof, flame-retardant PU cover. • CE Mark, ISO 13485, EN 60601-2-52 structural stability compliance. 1 2. Hydraulic delivery Beds • Medical or surgical beds • 3-section hydraulic obstetric labor, delivery, and recovery (LDR) bed; heavy-duty mechanical foot-pedal pump mechanism for variable elevation changes; gas-spring assisted backrest tilts; removable leg mattress parts; lithotomy leg crutches. • Level 2 to Level 6 (Dispensary to National Referral) 1 3. Delivery Set/Pack • Obstetrical or gynecological surgery instrument sets • Comprehensive surgical instrument kit for standard vaginal deliveries. Includes: episiotomy scissors, umbilical cord scissors, sponge forceps, arterial hemostatic forceps (straight and curved), needle holders, tissue forceps, 1 • and stainless steel instrument tray with lid. Premium medical-grade AISI 410/304 surgical stainless steel, satin/matt finish to prevent reflections, completely autoclavable. 4. General stitching set • • • Suturing sets or kits Minor tissue suturing instrument kit; medical steel grade composition; includes Mayo-Hegar needle holders, standard dissecting forceps (toothed/non-toothed), Iris tissue scissors, scalpel handle 3, and local anesthetic galley pot container. Level 2 to Level 6 (Dispensary to National Referral) 1 5. Autoclaving machine 50 litres • • Vertical or benchtop model; nominal 1 chamber capacity 50 L (or specify facility-required capacity); saturated steam sterilization; operating temperature range 121–134/135 °C; 220–240 V AC, 50 Hz; suitable pressure-rated chamber; timer and temperature/pressure controls; pressure gauge; safety pressure-relief valv
In your offer, clearly state the unit price (based on delivery terms), delivery time and payment terms. TDS, certificates and reference projects speed up evaluation.

